San Ramon Valley Recycled Water Project - Pump Station R200A and Pipeline

Project: San Ramon Valley Recycled Water Project - Pump Station R200A and Pipeline
Value: $4,684,000.00
Description of Work: The general scope of work consists of a 2,200-gallon per minute (gpm) reclaimed water (booster) pumping station, known as Pump Station R200A, to be located near Iron Horse Trail and a 6,500 ft of recycled water transmission pipeline along Bollinger Canyon Road.

Status: Ongoing

Location: San Ramon, CA
Customer: US Army Core of Engineers

Summary of Work Performed:

Underground pump station located adjacent to the Iron Horse Trail, north of the existing electrical substation. Suction piping connected to a 16 inch diameter DERWA Pressure Zone 1 pipeline constructed in the Iron Horse Trail right of way. Discharge piping connecting to DERWA Pressure Zone 2 via new pipeline to be constructed in the Iron Horse Trail right of way. Approximately 6,500 linear feet of transmission pipeline at Bollinger Canyon Road: from the centerline of Iron Horse Trail to the Phase 1 connection point at the north side of Bollinger Canyon Road, approximately 695 ft east of the centerline of North Chanterella Drive.

 

 

 

 




 

Copyright © 2003 JMR Construction and its licensors. All rights reserved.