Summary of Work Performed:
The project consists of the installation of over 465,000 sf of 2'x2' multicolered high density concrete pavers over tapered concrete surfaces, waterproofed with Latacrete Waterproofing Systems using Bison Screw Jack Pedistals.
Included in the project were multiple buildings with a uniform checkerboard pattern as seen from the sky. The paver system was installed as the main traffic route for pedistrain visitors. |